Selective demolition and recovery
Industrial and civil demolition
Demolishing today means planning the end of a building as the beginning of new materials. ECOTRASP carries out controlled demolition of industrial and civil buildings and structures, separating fractions on site to recover rubble and ferrous materials.
At a glance
- Controlled demolition
- On-site separation
- Recovery of inert waste and metals
- Preliminary asbestos removal
Scope of work
- Industrial and craft sheds and buildings
- Civil buildings and agricultural structures
- Partial demolition and interior strip-out
- Dismantling of steel structures
Selective demolition
Before demolition we check for hazardous materials, starting with asbestos, which we can remove directly thanks to our Category 10B registration. During the works we separate inert waste, metals, wood and other fractions to maximise recovery and reduce waste sent for disposal.
A single partner
Remediation, demolition, transport and recovery handled by the same company: fewer interfaces, more reliable timing and one technical responsibility on site.
How we work
- Step 01Site survey and check of existing materials
- Step 02Preliminary asbestos removal where needed
- Step 03Controlled demolition and separation of fractions
- Step 04Transport and recovery
Frequently asked questions
Do you handle remediation before demolition?
Yes. If the building contains asbestos, we prepare the work plan and carry out remediation before demolition, coordinating the entire site.
What happens to the rubble?
Rubble is separated and recovered: inert materials can be given new life, while ferrous metals go to recycling chains.
Do you have waste to manage or a site to remediate?
Talk to our technical office: we assess your case, schedule a site survey and propose the most appropriate solution, both in regulatory and economic terms.